Turf to Triumph
Modernized athletic complex and locker rooms enhance safety and accessibility.
Turf’s Up, Game On
Persistent poor field conditions and long turf recovery times were a disruption of games, practices and physical education classes at Cazenovia Junior/Senior High School.
Lessons in the Open Air
Lansing aimed to expand learning beyond the classroom by creating a hands-on, sensory-rich outdoor environment, and Tetra Tech was brought in to design a flexible space for that purpose.
From Split to Soaring Space
Tetra Tech led a complex, design‑forward renovation to create a new state‑of‑the‑art gymnasium and Wellness Center for Waverly High School.
Community Pitch
Like many Districts upgrading their athletic facilities, Waverly Central School District aimed to transform its poor- draining natural turf baseball fields into a flexible multi-use artificial turf field to welcome several school sports, PE, marching band, and open community use.
Levels of Play
A previously underutilized outdoor play area at Burton Street Elementary was a poorly draining and monolithic hardscape not serving the needs of the 400-student population.